Fast Control System in Besiii Experiment
2009 16TH IEEE-NPSS REAL TIME CONFERENCE(2009)
关键词
accelerator control systems,data acquisition,electron accelerators,field programmable gate arrays,linear colliders,nuclear electronics,optical fibre communication,readout electronics,stability,BESIII experiment,Beijing Electron Positron Collider II project,Beijing Spectrometer III,FPGA reload,L1 check,L1 pass,SEDES reset,clock distribution system,deserialization,fast control signal transmission,fast control system,front-end electronics,loop current interference,optical fiber transmission,readout buffer,readout electronics,readout error,serial transmission,stability,status signals,system reset,timing uncertainty,trigger system
AI 理解论文
溯源树
样例

生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要