High Current and High Power Fast Kicker System Conceptual Design and Technology Overview for DeeMe Experiment
2013 Abstracts IEEE International Conference on Plasma Science (ICOPS)(2013)
关键词
accelerator magnets,beam handling equipment,modulators,Brookhaven researchers,DeeMe experiment,US-Japan collaboration,current 8 kA to 10 kA,fast pulse full time,frequency 25 Hz,high current fast kicker system conceptual design,high current generator,high energy physics experiment,high inductance magnetic load,high power fast kicker system conceptual design,high power generator,high voltage generator,identical modulator set,kicker magnet series,large aperture high inductance kicker magnets,low impedance transmission lines,multi GVA high deflection strength fast kicker system,passing beam deflection,pulse floor ripple tolerance,pulse repetition rate,pulsed current,technology overview,time 300 ns to 400 ns
AI 理解论文
溯源树
样例

生成溯源树,研究论文发展脉络
Chat Paper
正在生成论文摘要